December 2016 Tender Notice for the Reinforcement Project of the Seawall of Ningde Power Generation Co., Ltd.

The tender number bidding code: CBL_20161115_188879478
Bulletin category: Domestic tender

Tenderee: Fujian Datang International Ningde Power Generation Co., Ltd. Source of funding: Others (Part 2 of the tender) Fujian Datang International Ningde Power Generation Co., Ltd. Factory Tendering Reinforcement Project Tender Notice Project Name: Fujian Datang International Ningde Power Generation Co., Ltd. Tendering and Reinforcement Project Tendering for the Seawall of the Company's Factory Tendering No.: CWEME-201612GJND-S001
Tenderee: Fujian Datang International Ningde Power Generation Co., Ltd.

Bidding method: Domestic open tendering Type of tender: Project tender Area of ​​ownership: Fujian Province Sector: Energy According to the "PRC Tendering and Bidding Law", "The People's Republic of China Tendering and Bidding Law Implementation Regulations" and relevant laws and regulations, follow the open, fair, The principle of fairness and honesty and credit was entrusted by Fujian Datang International Ningde Power Generation Co., Ltd. to conduct domestic open bidding on the seawall reinforcement and reinforcement project of Fujian Datang International's Ningde Power Generation Co., Ltd. The units that meet the qualification requirements are welcome to participate.
I. Project Description:
Fujian Datang Ningde Power Plant is located at the south side of Longzhu Village, Wanwu Town, Fu'an, Ningde City, Fujian Province. The power plant has a total of 4 units, including a phase 2×600MW domestic coal-fired unit (3#, 4#) and Phase 2 2×660MW. Coal-fired generating units (1#, 2#) were completed and put into operation in 2006. The second phase of the project was put into operation in 2008. The installed capacity of the second phase was: 2520MW. It was constructed by Beijing Power Construction and Fujian Power Construction, respectively. East China Electric Power Design Institute Responsible for the main design, Guangdong Tian'an Supervision Company conducted construction supervision. The seawall project of the plant was completed in October 2006. It has a total length of 1.887km. The starting point at the southern end begins at the shoulder of the Lower Huashan Mountain on the south side of the site, and the north end meets the grey dyke through the transition section. Seawall began construction in April 2004 and was completed by October 2006. After 10 years of operation, the east-west dyke was covered by a dyke on the north side, and was affected by the wind and waves. The settlement was small and basically remained intact. Can meet the original design moisture standards. The north-south-to-sea embankment foundation of the main power plant of the power plant is a soft foundation, due to the uneven settlement of the embankment, the elevation of the embankment, the leakage of the local embankment, the shedding of the external slope-blocking stone, and other conditions, the original design embankment The elevation is 6.5m. The measured embankment elevation is 5.52-6.50m. The embankment elevation of most embankments is lower than that of the original designed embankment. The embankment can no longer meet the original design standards for moisture protection. There are potential safety hazards, especially during the typhoon tide. The safety of people and equipment in the embankment is severely affected. To this end, the plant is diverted from the north to the south to the sea embankment for reinforcement.
Second, the scope of the tender:
This tender is the reinforcement project for the seawall section of the plant, which has a length of 1.887km. The construction drawings for the reinforcement of the danger have been designed and completed by the Fujian Water Conservancy and Hydropower Design Institute. (See the attached electronic version).
The bidding scope of this project consists of three parts:
The first part is the seawall embankment heightening project, which divides the original block masonry block removal; gravel packing; gravel cushion; C25 concrete embankment cover; C25 concrete shoulder; C30 concrete retaining wall and corresponding expansion Sew settings and other works.
The second part is the seawall embankment protection project, divided into C25 concrete shoulder; C25 concrete foot protection; C25 box beam girder; C30 concrete four-foot hollow block slope; expansion joints and other projects.
The third part: seawall anti-seepage project, subdivision slope cleaning; silt filling; surface covering and turf slope protection and other projects.
The specific work content shall be based on the final record of the bidding documents.
Third, the bidder's qualification requirements:
The bidder shall have the ability to perform the contract satisfactorily and shall meet the following conditions:
3.1 It has the legal personality and the ability and power to independently conclude and perform the contract. The registered capital is not less than RMB 20 million.
3.2 valid business license, organization code certificate, tax registration certificate.
3.3 Professional technicians, equipment and facilities in construction, quality control, etc., with ISO9000 series or equivalent quality assurance system certification and annual inspection records.
3.4 It has one level of general contracting for water conservancy and hydropower construction, or more than grade one qualification for professional contracting of embankment engineering.
3.5 In the past five years, the performance of a similar seawall project has not less than two and the running time is not less than two years, providing user certification documents.
3.6 Has good bank credit and business reputation, is not being ordered to suspend business or bankruptcy, and assets have not been reorganized, taken over and frozen. Audited financial statements for the past three years.
3.7 In the construction of engineering projects undertaken by the China Datang Corporation in the past, there were no technical, quality or commercial disputes involving the main responsibility of the bidders.
3.8 Provide qualifications (photocopy) and construction performance of project managers and key technicians of this project.
3.9 The Commonwealth does not accept bids for this consortium.
Fourth, the tender documents obtained:
4.1 How to Obtain Bidding Documents: (.)
4.2 Bidding documents are issued: From 15 November 2016 to 17:00 pm on November 25, 2016, overdue deadlines will not be accepted. (The bid fee must be wired by the company's account, otherwise the invoice for the bid cannot be issued.)
Note: According to relevant national laws and regulations, as of October 1, 2016, bid security and bidding fees must be paid by the bidders participating in the bidding of the project in the name of the company's public account, and will not accept the payment of bid security in the name of the individual. The bidding fee shall not be paid in other units or in the name of the individual.


4.3 After the tender has adopted the post-qualification method, the bid evaluation committee will review the qualifications of the bidders after the bid opening. The bidders' bids that do not meet the requirements of the tender notice will be treated as rejected bids.
V. Submission of tender documents:
5.1 Deadline for Submitting Bidding Documents (Bid Deadline, the same below): At 10:00 am on December 6, 2016 (to be announced).
5.2 Place of delivery: Beijing (to be notified)
5.3 Submission methods: Prior to the deadline for submitting tender documents, potential bidders submit paper tender documents and their electronic versions according to the requirements of the tender documents, and complete the electronic uploading and uploading of electronic tender documents. Written documents submitted late or not delivered to designated locations or not sealed as required will not be accepted by the tenderee.

Contact: Zhang Jie

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

Fiber Optic Connector

Fiber Optic Connector,Fiber Connector,Fiber Termination,Fiber Adapter

Huizhou Fibercan Industrial Co.Ltd , https://www.fibercan-network.com